» Road Network
Development of a 60m wide, 76 km long city level Ring Road estimated cost of Rs.335crores
• Usually, the land acquisition process is used to acquire land for provision of infrastructure
• The land falling in urbanized zone, of 59 K.m. length, is procured through TP Scheme.
•  Length of 17 k.m. falling in non urbanized area is acquired by land acquisition.
• Two lane road is operational and one BOT base construction of two lane is started  and it is likely to be completed by     June ‘08
Four links of the Ring Road
Link 1: Rajkot Highway Junction (NH-8A) to Vadodara Highway Junction (NH-8) of 14.106 kms
Link 2: Vadodara Highway Junction (NH-8) to Himatnagar Highway junction (NH-8) of 25.518 km
Link 3: Gandhinagar Highway Junction (NH-8C) to Rajkot Highway Junction (NH-8A) of 22.862 km
Link 4: Himatnagar Highway junction (NH-8) to Gandhinagar Highway Junction (NH-8C) of 13.827 km
 
» Over Bridges
Pt. Dindayal Upadhyay railway over bridge, Chandlodiya.
Shyama Prasad Mukharji railway over bridge, Vejalpur
» Under Pass
Construction of under pass below railway line near Nirnaynagar @ the cost of Rs. 6. 00 Crores approx.
    
» Flyover Bridges
Construction of 4 lane ROB/Flyover bridge on Chankaypuri Railway crossing @ the cost of Rs. 14.00 Crores approx.
    
(1)  Flyover at Memnagar Junction on 132’ Ring Road
(2)  Flyover at Shivranjani Junction on 132’Ring Road
(3)  Flyover at Sola Junction on 132’ Ring Road.

 